Cable Voltage Drop Calculator

Cable voltage drop is the reduction in voltage between the supply and the load caused by current flowing through the cable’s impedance. Use this calculator for preliminary copper or aluminum cable checks on DC, single-phase AC and balanced three-phase AC circuits. Enter the one-way route length; the calculation already accounts for the circuit arrangement.

The guide below explains the inputs, formulas and results, with a three-phase feeder example and a DC circuit example. It also shows how voltage drop fits alongside ampacity and protection when selecting a project cable.

Calculate estimated voltage drop for copper or aluminum cables in DC, single-phase AC and three-phase AC circuits.

Enter the distance from source to load.

Advanced AC Input

Use project-specific cable data when available.

Calculation Results

Voltage Drop —
Voltage Drop % —
Receiving Voltage —
Resistance —
System —
Conductor —
One-Way Length —
Load Current —
Power Factor —
Reactance —
Engineering Note

This calculator provides a preliminary engineering estimate. Final cable selection should be verified against the actual cable data, installation method, operating temperature, applicable standards and project requirements.

Enter the circuit conditions, not just the conductor size

InputWhat to enterWhy it matters
Electrical systemDC, single-phase AC or balanced three-phase AC.The circuit arrangement changes the voltage-drop formula.
System voltageSupply voltage across the load; line-to-line voltage for three-phase AC.The tool uses this voltage as the reference for percentage drop.
Load currentOperating circuit current in amperes.Drop increases with current when the other inputs remain fixed.
Cable lengthOne-way route length in metres.Single-phase and DC return paths are already included in the formula.
Material and sizeCopper or aluminum and nominal conductor area in mm².The tool estimates resistance from material and area. Convert AWG or kcmil using the conductor-size guide where necessary.
Conductor temperatureThe selected operating conductor-temperature assumption.Resistance rises with conductor temperature. This is not the surrounding air or soil temperature.
AC power factorOperating power factor, above zero and up to one.The AC formula combines resistance and reactance for a lagging-load assumption.
ReactancePer-conductor reactance in Ω/km for the intended AC arrangement.Formation and cable construction affect this value; use project cable data where available.
Allowable dropThe percentage allocated to the assessed cable section.The tool compares against your selected target, not an automatically selected code limit.

Use one-way length and the correct voltage reference

For a load 100 m from the supply, enter 100 m. In a two-wire DC or single-phase circuit, the formula multiplies by two to include the outgoing and return conductors. Entering 200 m would count the return path twice.

For balanced three-phase AC, enter the same one-way route length. The √3 multiplier accounts for the three-phase voltage relationship. Use line-to-line voltage, such as 400 V on a 400 V three-phase supply, with the phase-conductor current.

A long feeder followed by a final circuit contains more than one cable section. Calculate the sections using their own current, size and length, then assess the total on a consistent voltage reference. The voltage-drop budget at the equipment includes the upstream route as well as its final connection.

Voltage-drop formulas used by this calculator

Here, I is current in A, L is one-way length in km, R is conductor resistance at the selected temperature in Ω/km, X is reactance in Ω/km, and cos φ is power factor. The form accepts metres and converts them to kilometres internally.

CircuitEstimated drop ΔVCalculation basis
Two-wire DC2 × I × L × REqual outgoing and return conductor resistance.
Single-phase AC2 × I × L × (R cos φ + X sin φ)Equal outgoing and return conductor impedance.
Balanced three-phase AC√3 × I × L × (R cos φ + X sin φ)Balanced load and consistent phase-conductor impedance.

Voltage drop (%) = ΔV ÷ supply voltage × 100
Estimated receiving voltage = supply voltage − ΔV

How conductor resistance is estimated

The tool uses R20 = ρ20 × 1,000 ÷ S, then RT = R20 × [1 + α(T − 20)]. Its copper assumptions are ρ20 = 0.017241 Ω·mm²/m and α = 0.00393/°C; aluminum uses 0.028264 Ω·mm²/m and 0.00403/°C. S is conductor area in mm² and T is conductor temperature in °C.

This area-based estimate provides a useful preliminary comparison. Final calculations can require the actual conductor resistance, AC skin/proximity effects and arrangement-specific reactance. The displayed receiving voltage is an approximate magnitude calculation, rather than a full network load-flow result.

Worked examples you can reproduce in the tool

Three-phase feeder: 70 mm² copper, 100 m, 100 A

Select three-phase AC, 400 V, 100 A, 100 m, copper, 70 mm² and 90°C conductor temperature. Set power factor to 0.90, reactance to 0.08 Ω/km and the chosen drop limit to 5%.

StepValue in this example
Resistance at 90°C0.31405713 Ω/km, displayed as 0.3141 Ω/km
Length conversion100 m = 0.1 km
Drop calculation√3 × 100 × 0.1 × [0.31405713 × 0.90 + 0.08 × √(1 − 0.90²)]
Estimated voltage drop5.50 V, or 1.37%
Estimated receiving voltage394.50 V

The result passes the selected 5% target for this cable section. That target is an example input, not a statement that 5% applies to every project. Keeping all other inputs fixed and doubling the route to 200 m doubles the estimated drop to 11.00 V, or 2.75%.

Two-wire DC: 6 mm² copper, 50 m, 20 A

Select DC, 120 V, 20 A, 50 m, copper, 6 mm² and 70°C. The tool ignores power factor and reactance in DC calculations. The resistance estimate is 3.4381 Ω/km, giving 2 × 20 × 0.05 × 3.43814275 = 6.88 V, or 5.73%. Estimated receiving voltage is 113.12 V.

With a chosen 5% target this example needs review. A larger conductor or shorter route can reduce the loss, but the equipment’s operating-voltage requirement remains the important outcome.

Interpret the result and choose the right limit

Voltage drop in volts shows the estimated reduction along the assessed cable. Percentage drop relates that reduction to the entered supply voltage. Receiving voltage helps relate the result to the equipment. Conductor resistance shows the temperature-adjusted resistance used in the model.

The PASS or CHECK CABLE SIZE message compares only the estimated percentage with your entered limit. Set that limit from the applicable installation requirements, equipment tolerance and the share of the total route budget assigned to this section.

IEC 60364-5-52 addresses wiring-system selection, including voltage drop. Apply the edition and national requirements adopted for the project. A frequently quoted percentage is not a substitute for identifying the circuit type and assessment boundary.

Motor starting is another operating condition: starting current, power factor and upstream source impedance can differ substantially from normal running. Evaluate it separately. Unbalanced loads, harmonics, leading power factor, long-line capacitance and complex MV/HV networks can require a more detailed system study than this steady-load estimator provides.

Reduce voltage drop where it makes the most difference

  • Increase conductor area. This lowers the resistance component; in AC circuits the remaining reactance contribution should stay in the assessment.
  • Shorten the electrical route. A revised equipment location or feeder arrangement may be more effective than a larger cable alone.
  • Review the load basis. Use a justified operating demand and assess starting or transient conditions separately.
  • Assess parallel paths as a designed arrangement. Current sharing, matching conductors and mutual effects need their own review; this tool has no parallel-run input.
  • Consider system changes at project level. Voltage transformation or a different distribution layout affects equipment, protection and safety as well as cable losses.

Our preference is to resolve the full route early. It avoids selecting each section against an isolated limit and discovering at commissioning that the equipment sees the combined effect.

Combine voltage drop with ampacity and protection

A cable can pass the voltage-drop target while still requiring a different conductor size for current capacity, fault withstand or terminal conditions. Use the cable ampacity calculator for a separate preliminary thermal comparison, then coordinate the actual cable with the protective devices and installation arrangement.

For construction-specific information, explore XWA low-voltage power cables and medium-voltage power cables. Keep the rated voltage, conductor size, insulation, sheath, armour or screen requirements together in the project schedule.

Voltage-drop questions

Should I enter the cable length or the loop length?

Enter the one-way cable route. The DC and single-phase formulas already include the return path; the three-phase formula uses the one-way length with √3.

Is the temperature input the outdoor temperature?

No. It is the conductor-temperature assumption used to estimate resistance. Cable loading and the installation environment determine the conductor’s actual operating temperature.

Is 3% or 5% always the correct voltage-drop limit?

No single target applies to every circuit and assessment boundary. Use the project requirements, applicable rules and equipment tolerance, allowing for upstream cable sections.

Can I calculate voltage drop from watts or kW?

This tool accepts current. Convert the load using the correct system voltage, phase arrangement, power factor and, where relevant, efficiency before entering amperes.

Why can two tables give a different result?

They may use different conductor temperatures, resistance values, reactance assumptions or circuit arrangements. Compare those bases before comparing the final percentage.

Discuss your cable route with XWA

Send the system voltage, operating current, route length, installation arrangement and required standard, together with the voltage-drop target. For motor circuits, include starting details where available. A cable schedule helps us discuss a practical construction and focused project quotation. Email: info@xwacable.com.