A cable short-circuit rating combines current, duration and temperature conditions. A one-second rating is a thermal withstand reference, not continuous ampacity. Compare the fault energy delivered before protection clears with the withstand of the relevant conductor, screen or sheath and connections. Mechanical restraint requires a separate check.

Concept illustration of a copper conductor and stopwatch explaining fault duration.
Short-circuit duty combines current, duration and temperature.

Read the seconds beside the kiloamperes

A datasheet’s short-circuit current depends on material, plošný vodič, starting temperature, permitted final temperature and calculation method. Duration belongs beside the current: a high current interrupted quickly can produce less heating than a smaller current that persists.

The network study establishes the available fault current. The selected cable has a defined withstand. Between those two, protection determines the exposure through detection, operation and interruption. Our preference is to keep those three records together rather than compare the cable and switchgear using a single kA figure.

One conductor, two clearing times

Consider an illustrative adiabatic calculation for a 120 mm² conductor with an assumed coefficient k of 143 A·√s/mm². In a project, k follows the material and initial/final temperature basis; it is not a universal value for every copper cable.

I = kS / √t, where I is the equivalent thermal current in amperes, S is area in mm² and t is duration in seconds. Equivalently, compare já²t with k²S².

Illustrative 120 mm² dirigent, assumed k = 143
Thermal comparison1.0 second0.2 second
Calculated permissible current17.16 kA38.37 kA
Example fault current20 kA20 kA
Fault energy, já²t400 million A²s80 million A²s
Conductor limit, k²S²294.47 million A²s294.47 million A²s
Result for this assumed conductorAbove the thermal limitBelow the thermal limit
Chart comparing 20 kA for 1 second and 0.2 second: 400 a 80 million ampere-squared seconds.
At the same current, shorter clearing reduces thermal exposure.

Na 20 kA, the simplified maximum duration is (17.16 / 20)², approximately 0.736 s. That calculation explains the relationship; it is not a protective-device setting. Apply the valid calculation range and the actual device and cable-system conditions.

The conductor’s continuous current rating has not changed between the two columns. Continuous service depends on sustained losses and heat dissipation; short-circuit withstand concerns a short event from a defined initial temperature.

Use the actual clearing duty, not just the relay delay

The time used in the thermal check should describe the relevant total fault-clearing duty. A relay delay alone may omit other parts of the operating and interruption sequence. Backup protection can introduce a different exposure that also needs assessment.

For a changing current waveform, thermal duty is represented by the integral of current squared over time. A simple I²t check uses an appropriate equivalent current for that interval. For a current-limiting fuse or circuit-breaker, use the applicable manufacturer’s let-through energy data, with its specified voltage and prospective fault conditions.

IEC 60909 addresses AC network short-circuit calculations. IEC 60949 addresses permissible cable thermal current, starting with an adiabatic result and accounting for non-adiabatic heating through a modifying factor. Follow the method and edition adopted by the project; a short-time approximation should remain within its applicable conditions.

Úředník thermal calculation framework explains that approach. It describes a method, rather than certifying a particular cable.

Check the conductor and the metallic return path separately

An earth fault on a screened MV circuit can involve the metallic screen and its bonding system. The network and earthing arrangement determine the current assigned to that path. Screen duty should therefore come from the system study rather than from the cable’s normal load current.

Functional schematic separating phase conductor, metallic screen and connection assessments.
Dirigent, screen and connections have distinct fault-duty checks.

A designation such as 1×240/25 distinguishes a 240 mm² phase conductor from a 25 mm² kovová obrazovka. They have different areas and functions. Screen material, connections, bonding leads and accessories each belong in the fault-path assessment.

IEC 60986 addresses temperature limits for its covered MV range, considering insulating and other cable materials, connections and accessories. Retain that construction context when selecting the calculation assumptions.

XWA N2XSY screened MV cable page separates conductor and screen information. For an LV feeder, N2XY XLPE power cable provides the corresponding construction context. Neither product name replaces the circuit’s thermal and protective-path checks.

Thermal withstand and peak-force restraint answer different questions

Fault current also creates electromagnetic forces. Cleats, podporuje, bends and termination restraints need assessment for the relevant peak current and cable arrangement. An RMS thermal rating in kA for a stated duration is not a mechanical restraint rating.

On large single-core circuits, formation and the complete support load path become especially important. Our MV cable restraint guide explains the installation side of that assessment.

Keeping the two checks distinct improves the specification: one controls permissible heating, while the other addresses the forces transmitted through the installed system.

Build a fault-duty record that can follow the cable schedule

Record the fault current at the relevant location, total clearing time or let-through energy, conductor and screen/sheath construction, temperature basis and calculation method. Add the connection, accessory and restraint requirements. Those conditions make a rating meaningful and allow alternatives to be compared consistently.

For XWA project discussions, send the voltage class, kabelový rozvrh, fault-study values and protection-clearing information. Include metallic-screen or sheath duty where applicable. This gives us a focused basis for discussing the construction and quotation at info@xwacable.com.